Stainless Steel Channel
Stainless Steel Channel

Grade:200 Series/300 Series/400series
Standard:JIS, AiSi, ASTM, GB, DIN, EN, BS
Certification:SGS ISO
Tolerance:±1%
Processing Service:Bending, Decoiling, Punching, Cutting

Product introduction

CommodityStainless Channel Steel 
Material Grade200/300/400/900 Series
Widthregular width or customer’s requires.
Thicknesscold rolled:0.3mm-3.0mmhot rolled:3.0mm-100mm
Length1000mm - 6000mm or as customer's request
SurfaceNo.1,2b,8k,2d,Ba,No.4,No.6,No.8, etc.
EdgeMill Edge and Slit Edge
Normal Grade201/202/304/304l/316/316l/321/309s/310s/410/420/430/904l
StandardsAISI ASTM JIS SUS and GB
CertificationsISO 9001,SGS,BV
ApplicationsKitchenware, utensils, tableware, household appliances, construction decoration and dailyproducts
PackingSeaworthy wooden pallet or according to client's requirement
MOQ1 ton or free samples
Price termFOB China port & CIF Destination Port & CFR
AdvantageShowing the splendor of your quality ;Strong corrosion resistance and decorative effect ;Durable and beautiful in good taste .


Surface

Surface Finish Definition Application
2B Those finished, after cold rolling, by heat treatment, pickling or other equivalent treatment and lastly by cold rolling to given appropriate luster. Medical equipment, Food industry, Construction material, Kitchen utensils.
BA/8K mirror Those processed with bright heat treatment after cold rolling. Kitchen utensils, Electric equipment, Building construction.
NO.3 Those finished by polishing with No.100 to No.120 abrasives specified in JIS R6001. Kitchen utensils, Building construction.
NO.4 Those finished by polishing with No.150 to No.180 abrasives specified in JIS R6001. Kitchen utensils, Building construction, Medical equipment.
Hairline Those finished polishing so as to give continuous polishing streaks by using abrasive of suitable grain size. Building Construction.
NO.1 The surface finished by heat treatment and pickling or processes corresponding there to after hot rolling. Chemical tank, pipe.

 

Processing Equipment

Packing & Shipping

Packing Details Export sea worthy package + water proof paper + wooden pallet
Safe loading and fixing Professional teams
Price term FOB China port & CIF Destination Port & CFR
MOQ 1 ton
Delivery Detail

within 5-20 working days after receiving the deposit or according

 

Application

Quotation Request

Submit

Product Introduction